Construction of the Hinterland railway. Conclusion of contract. Statements of the railway commissioner on the cost estimate of the new railway construction Lome - Atakpame of 12 Oct. 1909. Contract between the Treasury of the Togo Protectorate and the Deutsche Kolonial-Eisenbahn-Bau- und Betriebsgesellschaft for the purpose of drawing up the detailed design and cost estimate for the construction of a metre-gauge railway from Lome to Atakpame in accordance with the 'Draft contract for the construction of a railway from Lome to Atakpame' and the 'Building regulations for the construction of the Lome - Atakpame railway' of 29 Nov/11 Dec 1909. Nov./11. Dec. 1908; report by the building inspector W. Meier on his trip to Togo and construction programme for the construction of the Lome - Atakpame railway dated 7 May 1910; cost estimate dated 8 July 1910; contract for the construction of the railway from Lome to Atakpame