Reports

Preparatory and implementing measures for the construction of the coastal railway Lome-Klein Popo (=Anecho). Explanatory report concerning the construction of a small railway with 75 cm track gauge from Lome to Klein Popo dated 18 Jan. 1902 with cost estimate, yield calculation, calculation of the superstructure. Memorandum. Calculations on water and fuel consumption of the locomotives intended for the coastal railway, construction acceptance report dated 25 Aug. 1905 with details of the technical data of the two 2/2 gek. tender locomotives from Henschel, Kassel

There are no relevant reports for this item